Your resource for Maximo® implementation, integration, upgrade and support.                                   Home   

    

__________________________

    Services                    

   Maximo Implementation

   Actuate and BIRT Reports

   

 Project Experience

 Skills List

 Contact                          

   Tim Fowlow P.Eng.

   250 Hamptons Terr NW

   Calgary AB T3A 5R5

   Canada

 

  Phone: 403 355 5782

 

 

   Email:fowlow@timfowlow.com 

 

 

 

Actuate and BIRT Report Development

Do you need an Actuate or BIRT report developer to produce, upgrade or fix a Maximo based report? Then consider contacting Tim who has coded dozens of reports for Maximo and has an in-depth understanding of the Maximo database schema gained from over 10 years of experience working with Maximo.

Tim is licensed Maximo user and maintains his own Actuate and BIRT report development environments .  This means that he can develop the report off-site and then send you the completed report files that are ready for installation.  If required, Tim can also Remote Desktop into your development environment and perform the installation for you.

A typical development scenario begins with a sample layout of the report and a set of requirements that describes any special processing and report parameters.

Next, the report is designed and coded and a user review is conducted to verify that the report meets the specification.

The entire report development process typically takes between 4 and 16 hours so contracting Tim to build your Actuate report makes sense when you need a quality report completed in a timely fashion and at a fraction of the cost it would take to acquire the reporting skills and develop the report in-house.

Some of the reports that Tim has enhanced or developed are listed below.

BIRT

  • Work Order Report

  • Key Sign-Out Report

Actuate

  • Inventory Count Sheet (view sample)

  • Location Hierarchy Report (view sample)

  • Activity Log Report (view sample)

  • Purchase Order Form (view sample)

  • Top "N" Equipment Cost Report  (view sample)

  • Inventory Valuation Report

  • Equipment Move History Report

  • PM Forecast Report

  • Enhanced Work Order Details Form

  • Outstanding Work Report

  • Inventory Transaction Summary (e-Spreadsheet)

  • Work Order List (e-Spreadsheet)

 

Tim is also an SQR report developer. Some of the reports that he has produced are listed below.

SQR

  • Standard Work Order

  • Maintenance Log Report

  • Work Order Invoice

  • Workload Analysis

  • Shipping Notice

  • Barcode Labels

  • Inventory Backorder Report

  • Inventory Pick lists

  • Availability by Equipment/Location

  • Credit Card Usage Report

  • Refit Specification (XML format)

  • Pipeline pigging and batching report

  • Pipeline Right-of-way Inspection Report

  • multiple data extraction, transformation and load utilities (ETL) for Maximo inventory and purchasing modules.

    


Copyright © 2011 Tim Fowlow Consulting Ltd.
Maximo ® is a registered trademark of IBM

Actuate ® is a registered trademark of the Actuate Corporation

Last modified: August 18, 2011